Tell us your requirements — we'll respond with a tailored proposal within 24 hours
Shandong Province, China
Mon–Sat: 8:00–18:00 (GMT+8)
Online inquiries: 24/7
Typically 60–90 days from order confirmation to shipping, depending on line complexity. Installation and commissioning adds 30–45 days on-site.
Yes. Our engineers travel to your site for installation supervision, commissioning, and operator training. This is included in our turn-key package.
Standard terms: 30% T/T deposit, 70% before shipping. For large projects, we can discuss L/C or milestone-based payments.
Absolutely. We encourage factory visits. You can inspect our workshop, see equipment under production, and meet our engineering team. Contact us to arrange.
The more of this you send, the closer our first proposal will be to a final one
Blanket, board, paper, module, felt or bulk fiber — and the classification temperature you need (1260°C, 1350°C or 1430°C). Grade drives furnace specification, so it is the single most important input.
Tonnes per year, and whether you intend to run continuously or in campaigns. Continuous operation materially changes furnace sizing and your energy cost per ton.
Target density range, thickness, width and roll or sheet format. These set the forming section, needle loom width and cutting equipment.
Available floor area and building height, local power supply (voltage, frequency, available capacity), water availability and ambient conditions.
If you plan to use locally sourced alumina and silica, send the analysis. We design the batch formulation and furnace around your actual materials rather than an idealised composition.
Manual, semi-automatic or fully automatic with SCADA and remote monitoring. Automation is the largest variable in both capital cost and operating labour.
What happens after you send an enquiry