Ceramic Fiber Blanket Production Line

Complete needle-punched blanket manufacturing — from raw material melting to rolled finished product

Jinyuan designs and manufactures continuous ceramic fiber blanket production lines, from raw material batching and resistance melting to binder-free needle punching and finished roll packing.

The standard spun route uses a water-cooled, two-roller spinning machine and negative-pressure fiber collection. Share grade, finished width, thickness, density and annual tonnage so the melting, fiberizing, needling and curing stations can be sized together.

Compare line configurations · See the eight process stations · Review supply and acceptance

Technical Specifications

Annual capacity3,000–10,000 t/year, configuration dependent
Classification temperature1260 / 1350 / 1430 °C
Working width1,220 or 1,830 mm; custom widths available. Confirm finished roll width after slitting.
Blanket thickness6–50 mm
Finished bulk density64–160 kg/m³
Spun fiber diameter and shot2–5 μm; shot content <15% for spun fiber
Finished moisture<1%
Melting furnaceWater-cooled resistance furnace; reference rated power 1,000–4,500 kW
FiberizingTwo-roller centrifugal spinning
NeedlingDouble-board with graded needles; approximately 130 strokes/min at 50 Hz, maximum 180 strokes/min on the brochure configuration
CuringMulti-zone tunnel; electric or gas heating
Line speedUp to 3.5 m/min, subject to product and setup
Controls and powerPLC + HMI; installed power and supply sized to the project
Reference floor area1,200–2,000 m²
Delivery and scheduleTurnkey, EPC or customized. Brochure schedule: manufacturing within 90 days; 30–45 days of on-site installation and commissioning. Confirm scope, shipping and site readiness in the proposal.

What to Send for a Blanket Line Quote

Finished roll specifications: List the grades, roll widths, thicknesses and densities you plan to sell. Include the annual tonnage for each major specification and the shifts you plan to run.

Plant and supply limits: Share your raw material analysis, available electrical capacity, cooling water and workshop dimensions. This helps size the melting, fiberising and needling sections for the same output target.

Scope and acceptance: State which equipment you already have and which services to include, such as installation supervision, commissioning or training. Use the supply and acceptance checklist to define what the quotation needs to cover.

Request Quotation Ask Technical Questions

Process Flow

How a ceramic fiber blanket production line runs from raw material to finished product

Raw material to finished roll: Batching → Resistance melting → Fiberizing → Collection and forming → Needle punching → Curing and setting → Cutting → Rolling and packing.

Key Equipment Included

Applications

Where the output of this line is used

Industrial Furnace Linings

Hot-face and backup insulation for heat treatment furnaces, forging furnaces, reheating furnaces and ceramic kilns.

Petrochemical Heaters

Lining for reformers, cracking furnaces and process heaters where thermal shock resistance is critical.

Power & Boiler Insulation

Duct, boiler wall and expansion joint insulation in power generation and waste incineration plants.

How to Choose a Blanket Line Configuration

1,220 or 1,830 mm working widthStart with the finished roll widths you sell. Ask for a slitting layout that shows how many rolls can run side by side and how much edge trim is needed.
Fiber qualitySpecify the required fiber grade, fiber diameter and shot content with the finished blanket specification. These requirements guide the two-roller spinning setup and the checks at acceptance.
Electric or gas curingChoose the heating option using available electrical capacity or gas supply. Ask for the proposed curing settings and utility requirements for the grades you plan to run.

Compare quotations against the same roll mix and operating calendar. Ask for saleable output per shift and the planned running hours behind the annual tonnage. The brochure's maximum line speed of 3.5 m/min is a separate specification.

Supply Scope and Acceptance

Equipment and services: Confirm the stations included from batching through packing, and who is responsible for plant layout, installation support, commissioning and operator training. If you already have equipment, identify where the new line connects to it.

Site responsibilities: Request an equipment list and a utilities schedule covering electrical supply, cooling water, fuel where required, ventilation and building clearances. Agree who prepares each connection before the equipment arrives.

Test conditionsAgree the raw materials, roll grade, dimensions and density, run duration, sampling points and pass criteria before testing.
Accepted outputWeigh finished rolls that pass inspection. Record saleable dry mass, trim and rejected rolls separately over the agreed run.
Roll qualityCheck width and length after cutting. Sample thickness and density across the width and verify finished moisture using the agreed methods.
Energy useAgree which equipment and utilities are inside the measurement boundary. If energy is part of acceptance, report metered electricity and fuel separately per tonne of accepted dry blanket.

Send your blanket line requirements to confirm the supply scope and acceptance conditions in the quotation.

Frequently Asked Questions

Common questions before ordering a ceramic fiber blanket production line

What annual capacity and width can I specify?
The standard brochure range is 3,000–10,000 t/year. Standard working widths are 1,220 and 1,830 mm, with custom widths available. Provide your finished roll sizes and annual product mix to confirm the layout.
What blanket grades and dimensions can the line make?
Reference classification temperatures are 1260, 1350 and 1430 °C. The listed thickness range is 6–50 mm and finished bulk density is 64–160 kg/m³, depending on the specified product and configuration.
How is the spinning section configured for my blanket grades?
The line uses two-roller centrifugal spinning. Share the target grade, fiber diameter and shot content alongside the finished roll specifications so the spinning section can be sized for the proposed product mix.
How long do manufacturing and commissioning take?
The brochure gives manufacturing within 90 days and 30–45 days for on-site installation and commissioning. Shipping and site readiness are separate. Confirm the project schedule in the proposal.
How should I compare energy consumption?
Ask for electricity and fuel per tonne of dry, saleable blanket under an agreed product mix and operating schedule. The installed power of a furnace or motor is not the specific energy consumption of the whole line.

Related Equipment

Other production lines we build

Further Reading

Technical guides and buyer resources

Buying and configuration

Production stages

Quality and troubleshooting

Interested in This Production Line?

Send us your capacity requirement and product specifications for a tailored proposal.

Get a Free Quote